Typical Test Times
Back to the AZTEST Enclosure Home Page
| Part | Requirement | Typical Duration |
|---|---|---|
| Instrument Panel | 100,000 TNR Langleys at 102°C | 4.5 to 7 months |
| Door Panel Upper / Armrest | 50,000 TNR Langleys at 85°C | 4 to 6 months |
| Door Panel Vertical | 5,000 TNR Langleys at 85°C | less than one month |
| Console (horizontal position) | 30,000 TNR Langleys at 93°C | 2 to 3 months |
| Overhead Parts | 10,000 TNR Langleys at 85°C | 1 to 1.5 months |
Learn about GM Validation
Return to the AZTEST Enclosure Home Page